[email protected]·Professional spray gun & spray system manufacturer

Can I Test Before Buying? How the Benelabo Sampling Process Works

Yes — every machine and capsule line can be trialled on your own material before purchase. You send the material, formulation and target spec; the trial runs on the target machine family under documented parameters; you receive samples, data and photos plus the parameter set that becomes your production baseline. Capsule filling trials start from 1,000 pieces; jet mill trials from 1.5 g batches; fluid bed trials from 30 g.

The Process in Four Steps

StepWhat happensWhat you get
1 · RequestYou send material details, process target and capacityTest plan + quotation within one working day
2 · TrialYour material runs on the target machine family under recorded parametersSamples couriered; photos and raw data
3 · ReviewEngineer walk-through of results against your specParameter set and configuration proposal
4 · DecisionParameters become the FAT baseline if you proceedCommercial proposal for the sized machine

What Can Be Trialled, Line by Line

LineTrialReport includes
MillingJet / pin / hammer mill on your powderParticle size distribution chart, yield
GranulationHigh-shear wet granulation + spray additionTorque curve, granule data, endpoint window
PelletizingExtrusion-spheronization, centrifugal routesPellet photos, size spread, yield
Fluid bed & coatingTop-spray / Wurster / hot melt filmsCoated samples, parameters
CapsulesFilling trial from 1,000 pcsFilled samples, weight variation

Why Trials Transfer to Production

Trials run on the same machine families that Benelabo sells — the S-LAB lab mill and MINI fluid bed are production-family equipment, so the parameter set you approve in the trial is the set your production machine is accepted against at FAT. Nothing is re-invented between the trial report and the shipped line.

FAQ

How much material does a trial need?
Jets run from 1.5 g batches, fluid beds from 30 g, extrusion from 0.12 kg, capsules from 1,000 pieces — send what your development stage can spare.

Is the trial report usable for internal approval?
Yes — distribution charts, photos and the parameter set are documented for your review file, and the same numbers anchor the FAT baseline later.

Start with a test plan

Send your material and target — plan and quotation within one working day.

Request a Quote Sampling Service